(904) 384-1270

BDA Installation

Public safety BDA / ERCES installation in Northeast and Central Florida, built to the approved design and ready for acceptance testing.

Built to the approved design

Once the BDA / ERCES design is approved, we carry the plans into the field. Our team makes sure the equipment, cable routes, antenna locations, donor path, grounding, monitoring connections and system interfaces are installed exactly as approved, following the manufacturer requirements and the applicable codes.

One experienced team carries the approved design through procurement, installation, integration, testing, documentation and ongoing service.

ADRF fiber BDA system with battery backup installed on a brick wall

What the installation covers

Equipment

We procure and install the specified BDA, battery backup, annunciator, RF components, coax, antennas and pathway materials.

Cabling and antennas

Coax and indoor antennas go in along the approved routes, with connections, supports, labeling, grounding and pathways checked as we go.

Donor antenna

We install and aim the donor antenna at the approved public safety tower, and verify signal levels, antenna isolation, grounding and surge protection.

System integration

The BDA, battery backup, annunciator, fire alarm monitoring, donor antenna and DAS are connected and set up as one complete system.

Verification and testing

Before acceptance testing we check the system against the approved plans, then commission and test it for the AHJ and the radio system license holder.

Optimization

We tune the system to the approved design, the available donor signal and the authorized frequencies.

ADRF BDA and battery backup installed on a concrete wall

Construction coordination

A BDA installation involves the owner, the general contractor, the electrician, the fire alarm contractor, the design team, the inspectors and the fire marshal. We coordinate all of them so the system is finished with fewer delays.

Site access and readiness

Equipment rooms, risers, ceilings, rooftops and secured areas, plus working hours and safety requirements, all reviewed before we mobilize.

Pathways and cable routing

Coax routes, sleeves, conduit, penetrations, risers and mounting locations coordinated with the general and electrical contractors, so conflicts are caught early.

Electrical and fire alarm

Dedicated power, grounding, surge protection and emergency power with the electrician, and the BDA supervisory and trouble signals with the fire alarm contractor.

Schedule and inspections

Our work follows the construction milestones: pathways, permanent power, ceilings, roof access, fire alarm readiness and the target inspection or occupancy date.

Change control

If field conditions differ from the approved plans, we document them and get the change reviewed before altering the system, so the closeout records match what was built.

Recent installations

Comba BDA and battery backup installed in a storage facility
Comba BDA system, Extra Space Storage, St. Johns County
BDA annunciator panel connected to the fire alarm system
BDA annunciator reporting to the fire alarm panel

Next step: acceptance testing

After installation, the system is commissioned and grid tested for the fire marshal. See how it works on our BDA Testing & RF Surveys page.

Ready to install your BDA system?

Call us to review your approved design or start from the RF survey. Se habla español.

Talk to a specialist today Free consultation & quote Call (904) 384-1270
Call now Free quote