(904) 384-1270

BDA Projects

Public safety BDA and DAS projects across Northeast and Central Florida, with the grid test before and after.

Before and after: real buildings, real grid tests

Each project started with a failed RF grid test. Red areas are below the signal level the fire marshal requires; green areas pass.

Swisher International HQ, Jacksonville

  • Buildings: 8
  • Size: over 800,000 sq ft
  • Construction: heavy concrete
  • Scope: RF testing, BDA design and installation
  • Solution: ADRF fiber DAS

The first grid test showed failing areas across several buildings. We designed a fiber DAS: fiber remote units placed at key points feed indoor antennas throughout the campus, all connected back to the BDA headend.

This let us use one donor antenna to receive the city radio signal and distribute it across the whole facility.

ADRF fiber DAS equipment installed at Swisher International
Swisher International grid test with most areas failing
Before: failed grid test
Swisher International grid test passing after the fiber DAS installation
After: passed grid test

Extra Space Storage, St. Johns County

  • Buildings: 1
  • Stories: 3
  • Size: 110,000 sq ft
  • Construction: metal
  • Scope: RF testing, permitting and installation
  • Solution: Comba BDA system

We ran the RF grid test during construction. Metal buildings are hard on radio signals, and this one failed.

We coordinated permits, inspections, cable pathways and the fire and electrical trades, and installed the cabling, antennas and the Comba BDA. We also coordinated the annunciator alarm connections with the fire alarm company and the dedicated power with the electrician.

Comba BDA system installed at Extra Space Storage
Extra Space Storage grid test failing during construction
Before: failed grid test
Extra Space Storage grid test passing after the Comba BDA installation
After: passed grid test

Pershing Elementary, Orange County

  • Buildings: 2
  • Stories: 3
  • Size: 160,000 sq ft
  • Construction: concrete tilt-up and steel
  • Scope: design, permitting, installation and commissioning
  • Solution: ADRF fiber DAS plus a Motorola digital repeater

We were awarded the contract to design, permit, install and commission a public safety BDA and a UHF radio system for this new school, which failed its RF grid test after construction.

The solution was an ADRF fiber DAS for public safety and a Motorola digital repeater for the school’s own radios, installed to Orange County Public Schools fire codes and guidelines, with OTDR, DTF line sweep and commissioning reports.

Public safety DAS equipment installed at Pershing Elementary
Pershing Elementary grid test failing after construction
Before: failed grid test
Pershing Elementary grid test passing after the fiber DAS installation
After: passed grid test

Ette Hotel, Kissimmee

  • Buildings: 1
  • Stories: 6
  • Size: 60,000 sq ft
  • Construction: concrete tilt-up and steel
  • Scope: RF testing, design, permitting and installation
  • Solution: ADRF BDA

The hotel passed in the common areas but failed in critical areas. Stairwells are a challenge for radio signals because they are enclosed in concrete.

We placed antennas near the stairwells to get a passing result. The ADRF BDA sits in a 2-hour rated room, and the donor antenna cable runs inside a 2-hour rated chase.

ADRF public safety BDA installed at the Ette Hotel
Ette Hotel grid test failing in critical areas
Before: failed grid test
Ette Hotel grid test passing after the ADRF BDA installation
After: passed grid test

Acquilus II Condominium, Jacksonville Beach

  • Building: high-rise condominium
  • Scope: RF testing, design, permitting and installation
  • Solution: ADRF BDA

The building failed its RF test and required a BDA. We placed the antennas in the common areas to get a passing result.

To make the vertical cable runs, we used the trash chute while keeping its fire rating.

ADRF BDA installed at Acquilus II Condominium
Acquilus II Condominium grid test failing
Before: failed grid test
Acquilus II Condominium grid test passing after the ADRF BDA installation
After: passed grid test

Dollar General, Green Cove Springs

  • Building: retail store
  • Construction: metal
  • Scope: RF testing, design, permitting and installation
  • Solution: ADRF BDA

This metal building failed its RF test and was required to install a BDA.

We designed the antenna layout for the metal structure to get a passing result, using an ADRF BDA.

ADRF BDA annunciator installed at Dollar General
Dollar General grid test failing
Before: failed grid test
Dollar General grid test passing after the ADRF BDA installation
After: passed grid test

Is your building next?

Call us for an RF survey. We will tell you if it passes and what it takes to fix it. Se habla español.

Talk to a specialist today Free consultation & quote Call (904) 384-1270
Call now Free quote